2026 BMW M4 Competition

Twin Pine Ford has the Nicest Inventory at the Best Prices!
This 2026 BMW M4 Competition delivers superb performance and luxury in one thrilling package. With a potent 3.0L turbocharged inline-six engine producing 523 horsepower and paired with an 8-speed automatic transmission, this M4 commands the road with authority. The all-wheel-drive system ensures confident handling in any condition, while the striking black exterior enhanced by carbon fiber accents creates an unmistakable presence.
Key Features:
- M Drive Professional with adaptive suspension technology
- Front ventilated seats for superior comfort
- M Shadowline Lights for a refined, aggressive appearance
- Carbon fiber trim for authentic M performance aesthetic
- Parking Assistance Package with 3D surround view camera system
- Executive Package including premium connectivity features
- HarmanKardon surround sound with 16 speakers
- Heated steering wheel and memory power seating
- Live Cockpit Pro navigation with widescreen display
- Apple CarPlay and Android Auto compatibility
This competition-grade M4 combines sport-tuned engineering with refined daily usability. Premium leather appointments, heated front seats, and intelligent climate control create a cabin crafted for the discerning driver. The sophisticated cabin technology suite keeps you connected and entertained on every journey.
Visit us today to experience the exhilaration this M4 Competition offers firsthand. Our team is ready to answer your questions and arrange a test drive that will showcase why this is the ultimate driving machine.
* All of our cars go through our Twin Pine Certified Process * While every reasonable effort is made to ensure the accuracy of this information, we are not responsible for any errors or omissions contained on these pages. Please verify any information in question with Twin Pine Ford (717)-733-FORD FORD *Prices exclude government fees such as: taxes and registration fees* Twin Pine Ford will only accept outside 3rd Party financing in the event we cannot match customers Pre-Approved rate. (See dealer for details.)
Disclaimer: We are not able to finance customers from the following states: Alaska, Arizona, California, Iowa, Kansas, Minnesota, North Dakota, South Dakota, Oklahoma, Ohio andor Tennessee. However, these customers are welcome to secure their own financing.
This 2026 BMW M4 Competition delivers superb performance and luxury in one thrilling package. With a potent 3.0L turbocharged inline-six engine producing 523 horsepower and paired with an 8-speed automatic transmission, this M4 commands the road with authority. The all-wheel-drive system ensures confident handling in any condition, while the striking black exterior enhanced by carbon fiber accents creates an unmistakable presence.
Key Features:
- M Drive Professional with adaptive suspension technology
- Front ventilated seats for superior comfort
- M Shadowline Lights for a refined, aggressive appearance
- Carbon fiber trim for authentic M performance aesthetic
- Parking Assistance Package with 3D surround view camera system
- Executive Package including premium connectivity features
- HarmanKardon surround sound with 16 speakers
- Heated steering wheel and memory power seating
- Live Cockpit Pro navigation with widescreen display
- Apple CarPlay and Android Auto compatibility
This competition-grade M4 combines sport-tuned engineering with refined daily usability. Premium leather appointments, heated front seats, and intelligent climate control create a cabin crafted for the discerning driver. The sophisticated cabin technology suite keeps you connected and entertained on every journey.
Visit us today to experience the exhilaration this M4 Competition offers firsthand. Our team is ready to answer your questions and arrange a test drive that will showcase why this is the ultimate driving machine.
* All of our cars go through our Twin Pine Certified Process * While every reasonable effort is made to ensure the accuracy of this information, we are not responsible for any errors or omissions contained on these pages. Please verify any information in question with Twin Pine Ford (717)-733-FORD FORD *Prices exclude government fees such as: taxes and registration fees* Twin Pine Ford will only accept outside 3rd Party financing in the event we cannot match customers Pre-Approved rate. (See dealer for details.)
Disclaimer: We are not able to finance customers from the following states: Alaska, Arizona, California, Iowa, Kansas, Minnesota, North Dakota, South Dakota, Oklahoma, Ohio andor Tennessee. However, these customers are welcome to secure their own financing.
- 16 Speakers
- 4-Wheel Disc Brakes
- ABS brakes
- AM/FM radio: SiriusXM with 360L
- Adaptive suspension
- Air Conditioning
- Apple CarPlay and Android Auto Compatibility
- Audio memory
- Auto High-beam Headlights
- Auto-dimming Rear-View mirror
- Auto-dimming door mirrors
- Automatic temperature control
- BMW Assist ECall
- BMW TeleServices
- Brake assist
- Bumpers: body-color
- Carbon Fiber Trim
- Compass
- Connected Package Pro Limited Term
- ConnectedDrive Services
- Delay-off headlights
- Driver door bin
- Driver vanity mirror
- Dual front impact airbags
- Dual front side impact airbags
- Electronic Stability Control
- Emergency communication system: BMW Assist eCall
- Executive Package
- Exterior Parking Camera Rear
- Four wheel independent suspension
- Front anti-roll bar
- Front dual zone A/C
- Front reading lights
- Fully automatic headlights
- Galvanic Controls
- Garage door transmitter
- HVAC memory
- Harman/Kardon Surround Sound System
- Heated door mirrors
- Heated steering wheel
- Illuminated entry
- Knee airbag
- Leather Shift Knob
- Leather steering wheel
- Live Cockpit Pro with Navigation
- Low tire pressure warning
- Lumbar Support
- M Compound Brakes with Black Calipers
- M Drive Professional
- M Shadowline Lights
- Memory seat
- Navigation
- Navigation System
- Occupant sensing airbag
- Outside temperature display
- Overhead airbag
- Overhead console
- Panic alarm
- Parking Assistance Package
- Parking Assistant Plus
- Parking View with 3D View (Surround View)
- Passenger vanity mirror
- Personal ESIM 5G
- Power door mirrors
- Power driver seat
- Power steering
- Power windows
- Radio data system
- Radio: AM/FM Audio System
- Rear anti-roll bar
- Rear reading lights
- Rear seat center armrest
- Rear window defroster
- Remote Engine Start
- Remote keyless entry
- Security system
- SiriusXM with 360L and 1 Year Trial Subscription
- Speed control
- Speed-sensing steering
- Spoiler
- Sport steering wheel
- Steering wheel mounted audio controls
- Tachometer
- Telescoping steering wheel
- Tilt steering wheel
- Traction control
- Trip computer
- Turn signal indicator mirrors
- Widescreen Display
- harman/kardon?? Speakers
$3,350 $85,900 discount NO HAGGLE PRICE
| Retail Price: | $89,250 |
| PA's #1 Ford Store Discount: | -$3,350 |
| No Haggle Price: | $85,900 |
Mileage:
10,903 Miles
Type:
Car
Exterior:
black
Interior:
kyalami orange/black
Engine:
Gas 3.0L 6 cylinder
Transmission:
automatic
Drive Type:
All Wheel Drive
Stock:
B10022
VIN:
WBS33HK07TCW10022






















